Our Solution
We took our standard units and mounted them onto a base plate for easy installation into the application.
- A dancer unwind.
- Idler rollers went into the FG-110 unit.
- The module FG-110 fed and cut the material to length.
- A continuous belt with dividers where the material fed out onto the conveyor.
- After the quantity was reached that was set on the control panel, the conveyor would index to a new position and a new stack was made.